RLBCI Document Center Forum Index RLBCI Document Center
Collaboration
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

The time now is Sun May 19, 2013 10:50 am
RLBCI Document Center Forum Index
View unanswered posts
 Forum   Topics   Posts   Last Post 
Current Bids  
No new posts Landlord Work / Barnes & Noble TI
5-16-13 UPDATE: Project is about to be to be given the "Green Light". Final Construction Drawings, Phasing Plan and Project Schedule are now posted below for you to download. All older sets of plans and schedules have been removed. Please take a few minutes to review the plans. If you have any questions or concerns, please send and RFI to my attention at jbourque@rlbcoi.com We expect to receive a "Notice to Proceed" from the owner within the next 72 hours. I will notify all subcontractors by email and will schedule a coordination meeting as soon as the NTP is issued.
   
8 8 Fri May 17, 2013 11:11 am
jbourque View latest post
No new posts The Shores at Marina Bay
Misc. Building Repairs
   
2 2 Mon Apr 29, 2013 3:08 pm
J parker View latest post
No new posts The Center's Rehabilitation Project
Rehab
   
3 3 Tue May 07, 2013 11:17 am
pfrontin View latest post
No new posts Moraga- Orinda Fire Station 43
Bid has been postponed indefinitely.
   
5 5 Fri Feb 15, 2013 2:22 pm
pfrontin View latest post
No new posts California Transit Shelter
The Work to be done is shown on the Plans, and generally consists of, but is not limited to: A. Construction of bus shelter sites adjacent to public roadways, B. Installation of Contractor-supplied bus shelters on shelter sites, C. Construction of accessibility features, such as curb ramps and pavement repair ancillary to such installations.
   
2 2 Fri May 17, 2013 11:45 am
pfrontin View latest post
Archives  
No new posts Tilden Corp. Yard. Maintenance Facility
Ground-up construction of new 5,500 SF maintenance facility for the East Bay Regional Park District. Bid Date Changed to Thursday Jan. 31th @ 2:00 PM. Estimated value is $1,500,000. Schedule is 200 working days.
   
16 16 Fri Mar 01, 2013 1:36 pm
jbourque View latest post
No new posts Whipple Rd. - Hayward / Tenant Improvements
Tenant Improvements in 4 seperate spaces. Each suite has its own set of plans. SOW includes soft demo, painting, floor covering, new framing, drywall, ddors, frames and hardware. P-lam millwork and window treatments. Restroom Accessories, Acoustical Ceilings, Plumbing, ADA ramps, pavement markings, AC repairs and some minor HVAC work and FRP on RR walls. Bids from subcontractors are due Tuesday February 5th, by noon. By invitation only. Plans are full size drawings in a PDF format.
   
7 7 Mon Feb 04, 2013 9:50 am
jbourque View latest post
No new posts Brickyard Landing Re-Roofing Project
Brickyard Landing Re-Roofing Project
   
10 10 Mon Mar 25, 2013 1:39 pm
J parker View latest post
No new posts SVACA - Silicon Valley Animal Control Authority
SVACA - Silicon Valley Animal Control Authority Tenant Improvement
   
10 10 Thu Jan 03, 2013 11:37 am
jbourque View latest post
No new posts Brookside Rd.
Project Folder for Team Use
   
2 2 Thu Feb 21, 2013 8:18 am
jbourque View latest post
No new posts Placerville DMV Field Office
Replace exterior wall wood shingle finishes with new cement plaster system and repaint the exterior if the office building at the Placerville DMV field office.
   
2 2 Mon Mar 04, 2013 3:00 pm
pfrontin View latest post
No new posts 13-002 San Mateo Fire Sta. 24
RL Brown Construction is no longer bidding this project.
   
3 3 Tue Jan 22, 2013 2:06 pm
pfrontin View latest post
No new posts Helling Library CTC Modulars
Work to include but not limited to, site prep, replace 12 sheet exterior siding and trim, demolition, construction of breezeway opening between the Library and the modular buildings, framing, drywall, doors and hardware, windows, acoustical ceiling, carpet tile, painting, fire alarm, fire sprinklers, HVAC, and electrical.
   
3 3 Tue Mar 12, 2013 11:01 am
pfrontin View latest post
No new posts Seascape Beach Resort Phase I
Exterior Building, Breezeway, Stair and Landing renovations at Bldg. D - Phase I of III Phases of work.
   
4 4 Mon Mar 25, 2013 1:30 pm
J parker View latest post
No new posts 2257 San Ramon Valley Developments
5,500sf commercial shell with approx. 0.4 acre landscaped parking lot. Sub Bids due Wed., March 27. Specifications are on the plan set.
   
2 2 Thu Mar 21, 2013 12:58 pm
pfrontin View latest post
No new posts Kings Beach Elementary School
Project includes removal and replacement of floors, ceilings, walls and other architectural, mechanical, plumbing and electrical components as required to access the structure. Sections of the existing roofing will be removed for the installation of a structural “over roof” and new roofing. The work also includes hazardous materials abatement.
   
4 4 Thu Apr 18, 2013 7:36 am
pfrontin View latest post
No new posts The Aspen at South Lake Tahoe
New build construction of apartments.
   
1 1 Tue Apr 16, 2013 7:52 am
pfrontin View latest post